ECCO 1/6 Global Model

Scientific Justification

Computational Requirements

Test Runs

First results from the spinup run

Run History

Grid

Density Calculation

Topography

The interpolated topography is already fine enough that only minimal handtuning has to be done. An example of the fine resolution is the Indonesian Throughflow region.

Initialization

Surface Forcing

Data

The model should be spinned up over two years of the period 1992 and 1993. Afterwards the full range 1992-1997 is simulated/
 
online (GB) permanent (GB)
input data (64 bit)
initialization (3D temp and salt) 1 1
monthly climatology (4D temp and salt) 12 12
daily forcing (3D wind stress and fluxes) 145 145
output data
thirdyearly restart (64 bit, 15GB) 30 360
daily snapshot (32 bit, 1GB) 180 2,923
total 368 3,441

It is assumed to run the model in pieces of 1/3 year and produce daily snapshots. The total run length is 8 years.



This page is maintained by Arne Biastoch, March 13, 2000